35+

YEARS OF
EXPERIENCE

ABOUT US ——

Since 2005, our company, operating under its new corporate identity as Merplan Yapı İnşaat Sanayi ve Ticaret Ltd. Şti., has successfully completed numerous residential projects in the Kağıthane and Eyüpsultan regions.

Furthermore, it continues its international growth by engaging in foreign trade, construction element sales, and construction applications in Francophone African countries such as Senegal, Guinea, and Ghana.

Today, Merplan Yapı continues to build the living spaces of the future with its strong solution partners and expert staff, in line with the principles of quality, trust, and sustainability.

  • Quality real estate services
  • 100% satisfaction guarantee
  • High-level professional team
  • Always on-time delivery
  • Always on-time service
About Us

Our Successfully Completed Projects

As Merplan Yapı İnşaat, we have rebuilt risky structures with modern architecture.
Delivered as earthquake-resistant, energy-efficient, and aesthetic living spaces.

We take great pride and happiness in presenting to you the numerous projects we have realized with our deep-rooted experience gained over the years both domestically and abroad, without compromising on quality and trust principles. With each of our works carefully planned and meticulously completed in its field, we continue to provide the best service to our customers and carry our success in the sector forward.

Urban Transformation and “Half is on Us” State-Supported Projects

Frequently Asked Questions ——

Urban transformation is the rebuilding or strengthening of risky structures or areas to be safe, healthy, and compliant with earthquake regulations.

The identification of risky structures is carried out by organizations licensed by the Ministry of Environment, Urbanization and Climate Change, municipalities, or universities. Property owners apply to have their buildings inspected.

No. Even a single owner can start the risky structure identification process by applying.

  • The report is uploaded to the system.
  • The objection period for the report begins (15 days).
  • The structure is officially declared “risky.”
  • The evacuation and demolition process is determined.
  • Owners choose a transformation model (contractor, cooperative, state support, etc.).

At least 2/3 majority based on land shares must be achieved. If 2/3 cannot be reached, the transformation cannot proceed.
If the majority is reached, the shares of those who do not accept can be put up for sale at market value.

Within the scope of the campaign, 875,000 TL grant, 875,000 TL loan, and 125,000 TL relocation support are provided for each residence. In this way, citizens who benefit from the 1 million 875 thousand TL financial support provided by the Ministry for each residence can have their houses rebuilt by contractor firms. For each of the beneficiary’s other residences, a loan of 1 million 750 thousand TL is offered. Loan repayments, which are interest-free for the first year, start 2 years after the building permit is obtained and are spread over a 10-year term.
Under the same conditions, 437,500 TL grant and 437,500 TL loan support are provided for a shop/workplace of the beneficiary. For each of the beneficiary’s other shops, a loan of 875,000 TL is offered.

Yes. Rental assistance can be provided to owners, tenants, and limited real rights holders in buildings declared as risky structures. The duration and amount vary by province.

  • Risky structure report
  • Evacuation document
  • Title deed information
  • Application form
  • Applications are mostly made through district municipalities or provincial directorates.
  • Risky structure report
  • Evacuation document
  • Title deed information
  • Application form
  • Applications are mostly made through district municipalities or provincial directorates.

Yes. If the technical report states that the building can be strengthened, retrofitting can be done instead of demolition. This requires a strengthening project and municipal approval.

  • Relocation assistance
  • Rental assistance (for a certain period). They do not have rights to a new apartment.

It varies depending on the condition of the building, the workload of the municipality, and the speed of the contractor. On average:

  • Identification – announcement process: 1–2 months
  • Project and permit: 3–6 months
  • Construction: 18–30 months

No. Even if the building is new, it falls under the scope of transformation if it is found to be risky.

In the new project, they are determined according to factors such as:

  • Size of the independent unit
  • Floor plan
  • Management plan